This week we are finishing the roof shots and preparing for the last week of shooting. I will need to do a few more wigs, possibly some more casting and we are waiting on some more costumes from the costume designer. There is a lot to do at this point and I think it will be pretty non stop until the 7th of Nov to make sure we get everything in time.
Monday - Prepare Manny for shot by rigging him at 45˚ angle to camera using a magic arm
- Discuss shots for the week with Simon
- List what casting and puppet maintenance is required for this week and the next
- Puppeteer Manny for rooftop shot
Tuesday
- Make some more central rods in preparation for wWednesdays shoot
- Assemble puppets with rods once received from costume designer
- Design and plan the making of the two headed puppet and embryo with Simon
- Begin making mini people for perspective shots on Friday
- Inspect costumes to make sure they're ready for filming and make any alterations/repairs necessary
Wednesday
- Finish rodding up puppets
- Puppeteering with Hedley
- Be on standby for repairs and maintenance to puppets
- help Simon rig puppets into shot
- make any changes that may be required for the shot such as wig alterations and changing heads
- discuss moulds, casting and wigs with Simon
Thursday
- Cast and wig making
- Create miniature puppets using magnets as a base and work along side art Department to create necessary elements required
- Help in setting up Friday's shot, rigging puppet, breaking down new costume Elements to match continuity
- Attach glens hands to leaflet
Friday
- Help rig puppet in place
- Puppeteer
- Rig leaflet to fall
- Arrange mini puppets
- Dress blood and body into shot
- Be on standby for repairs and maintenance to puppets