Monday, 27 October 2014

Action Plan - Week Beginning 27th October


This week we are finishing the roof shots and preparing for the last week of shooting. I will need to do a few more wigs, possibly some more casting and we are waiting on some more costumes from the costume designer. There is a lot to do at this point and I think it will be pretty non stop until the 7th of Nov to make sure we get everything in time. 

Monday 
  • Prepare Manny for shot by rigging him at 45˚ angle to camera using a magic arm
  • Discuss shots for the week with Simon
  • List what casting and puppet maintenance is required for this week and the next
  • Puppeteer Manny for rooftop shot 
Tuesday
  • Make some more central rods in preparation for wWednesdays shoot 
  • Assemble puppets with rods once received from costume designer
  • Design and plan the making of the two headed puppet and embryo with Simon
  • Begin making mini people for perspective shots on Friday
  • Inspect costumes to make sure they're ready for filming and make any alterations/repairs necessary
Wednesday
  • Finish rodding up puppets 
  • Puppeteering with Hedley 
  • Be on standby for repairs and maintenance to puppets 
  • help Simon rig puppets into shot 
  • make any changes that may be required for the shot such as wig alterations and changing heads
  • discuss moulds, casting and wigs with Simon
Thursday
  • Cast and wig making
  • Create miniature puppets using magnets as a base and work along side art Department to create necessary elements required
  • Help in setting up Friday's shot, rigging puppet, breaking down new costume Elements to match continuity
  • Attach glens hands to leaflet
Friday
  • Help rig puppet in place
  • Puppeteer
  • Rig leaflet to fall
  • Arrange mini puppets 
  • Dress blood and body into shot
  • Be on standby for repairs and maintenance to puppets

No comments:

Post a Comment