Action Plan - Week Beginning 13th October


This week we will be finishing the train carriage scene and doing the shot where Manny and Glen smash up a car. There are only two shoot days which means I'll have plenty of time to do some casting and wigs for the puppets we will need in the coming weeks. 

Monday 
  • Finish the shots we need for the train, there is one shot that we were supposed to get on Friday but ran out of time so that will be done first 
  • Set up the carriage to look like its the other side of the train for the next shots. 
  • I will need to make sure Manny and Mandy are placed correctly and that the rods are working and tensioned properly. 
  • Puppeteering
  • Be on standby for repairs and maintenance for puppets 
Tuesday 
  • This is a pre-light day so I will be in the office working on the puppets. 
  • The crow bar will need to be pinned into Manny's hands and the cricket bat into Glens Hands. These need to be attached really well because the shot requires a lot of action from the puppets. 
  • I need to figure out how to place the hand rods in the hands in such a way that they are controllable with maximum movement from the puppets. 
  • I'd also like to tidy up the Old Library because its a small shooting space and it's getting pretty unorganised. 
Wednesday
  • This is the shoot day for the car smash. I will be puppeteering Glens arms with Simon on his head and body. Hedly and Terry will be puppeteering Manny. 
  • I expect I will need to readjust rods and hand placements throughout the shoot due to the rough nature of the action! 
  • Be on standby for puppet repairs and maintenance 
Thursday
  • In the morning I will help strike the set and clean up. 
  • In the afternoon I will need to discuss with Simon what will need to be casted and the wigs I need to do for next weeks shoot. 
  • Make a start on the casting. 
Friday
  • Finish casting and start wigs. 
  • Also need to figure out how to make Manny pee off the top of the hotel for mondays shot. 

Saturday, 11 October 2014

Week 6th - 10th October

Monday was spent taking down the set from the week before and having a big tidy up. The Old Library as a shooting space is pretty cramped and we have a lot of set and lighting equipment with little place to store it all. I found some old shelves by the skip and we repurposed those into puppet shelves. I organised everything beautifully. The real work that I got done was finishing the wigs for Burger Man heads and making more new rod mechanisms.  




On Tuesday morning the set needed a few more adjustments and Steve needed to finish lighting it so I started preparing the puppets. A burger had been made earlier in the summer but we had no way of keeping it in the Burger Man's hands. The scene starts with a man eating a burger (Burger Man) and throwing the box on the floor while walking off. Glenn and Manny walk towards the night club but Glenn stops to pick up the litter and put it in the bin, Manny stops him. Later in the montage it comes back to the Burger Man, about to eat his burger and Manny comes along and takes his arm rods and makes Burger Man hit himself in the face. 

I used a dremel and a 2mm drill bit to make a small hole in the burger so that I could put a wire into it to push into the silicone hand of Burger Man. I made the hole big enough so that I could also put a rod in the burger for the later scene when he drops the burger because Manny takes control of his rods. 


We started shooting before lunch, I puppeteered Burger Man's legs. Simon puppeteered the burger box that would be thrown away (Katie, the art director made it and attached it to a rod), William puppeteered the body and head, and Hedley was on the arms... This was a real team effort! We did quite a few different takes, some with the burger box falling to the ground naturally and some very dramatically. Simon wasnt sure which he would prefer so we got several versions to give him the choice in the edit with Paco Sweetman, the editor. After lunch, we got the shot of Glenn and Manny. I did Glenns body and head and Katie did Glenns arms. Will and Hedley were on Manny. I was surprised at how little takes we did on this shot as there were some fairly complicated moves. Katie and I work really well together as puppeteers. 

Wednesday I pinned Manny's hands to Burger Man's rods while the set was changed slightly to look like it was in the same area but not exactly the same. I pinned the hands onto the rods in such a way that Burger man's rods were the only rods that needed to be controlled to do both Manny and Burger Man's hands. I was puppeteering the burger, it needed to fall out of Burger Mans hands as soon as manny grabs his rods. We did the same with the burger box and got some natural and some dramatic takes of the burger falling. After that was done we got a few extra shots that we weren't sure we'd have time for. The first was a close up of Glenn's hand picking up the burger box, and the second was Glenn miming some fighting moves while watching Manny make Burger Man hit himself. 














Thursday started with everyone working together to strike the set (take it down and clean up so Steve the cinematographer can take down his lights and get ready for the next set). After lunch I started to make a wig for Glenda, a female character that will be sat next to Glenn on the train. Lex is the costume designer for manOman, and she's absolutely incredible. Glenda's costume is very glamorous so I needed to create a wig that matched that style. Simon didn't give me any instruction on how he wanted it to look other than she needs a fringe. I tried giving her a short bob style but she looked more like a man trying to be a glamorous woman rather than an actual glamorous woman... I added some length to it and tried a different fringe and that seemed to work well. After I finished the wig, I put some new arms onto Manny because his previous arms were very tatty after the amount of pins it took to get them to stay on Burger Man's rod! 

First thing Friday I used psycho paints to put makeup onto Glenda while Steve was finishing prelighting the set. It took too long to set up the train carriage for him to finish on Thursday. To use the psycho paint, I mixed equal parts A and B onto a little tray and then added silicone pigment. I used black for the eyeliner, and mixed red, yellow and blue for the lipstick. Normally white spirit should be added to the psycho paint before use but I needed it to be quite thick and a strong colour. I did a few tests on heads that had defects on them first. Once I got my technique down, I painted on the eyeliner with a very fine paintbrush and a lot of patience. I used a cocktail stick to do the lipstick as I found it was easier to get a more precise shape. 




Glenda's costume arrived mid morning, I put a rod into her puppet and put the costume on. I then tidied Glenn and Manny up. We rigged all the puppets in place before lunch. After lunch we started filming. I was the light behind the windows. I had a big torch and was moving it across the window to make it look like the train was moving. Simon was shaking the set to also give movement to the train. Katie, Will and Hedley were puppeteering. I think this shot is going to look fantastic, I cant wait to see it in the edit! After we had finished the shot we had to make the set look like it was the other side of the train, so the camera would be looking from Glenns point of view. We changed the position of the newspaper, added graffiti on the window (KL+SB in a heart, meaning Katie Lenton + Steph Bolduc!) and also some litter on the ground. Steve didn't need to change any lighting for this set as it's basically the same, and it needs to look the same because it's the same train carriage. It's all ready for us to shoot on Monday with a new character, Mandy. This lady will be flirted with by  Manny. I need to do three wigs for her this weekend as she will have three different facial expressions. 













Monday, 6 October 2014

Action Plan - Week Beginning 6th October


This week we will be continuing with the montage scene. The rubbish bin and the interior train carriage. I haven't got a lot work to do on the puppets as I managed to get a lot of it done last week. We are still waiting on the costume designer for fridays costume, but she already has the puppet we will be using so I wont have any changes to do, only putting a new head on.


Monday
  • No puppeteering scheduled, so I will be able to work on putting a rod into the burger bun 
  • Finish the wigs for the burger man character. I have done one already but in the shot he will need three expression changes, which means three wigs! 

Tuesday
  • This is the first day of the rubbish bin part of the montage. It is set outside the nightclub where a man eating a burger will drop some littler and walk off. Glenn will then enter and pick up the litter, but Manny will stop him from putting it in the bin. 
  • Attach arm rods into puppets 
  • I will be puppeteering with Simon, Will and Hedley.
  • Be on standby for puppet repairs and maintenance  

Wednesday
  • I will need to pin Manny's hands to the Burger Man's rods so that it will look like Manny is controlling him when moving Burger Man's rods.
  • Puppeteering with Hedley and Will. 
  • Be on standby for puppet repairs and maintenance 

Thursday
  • I will help strike the set and then while the train carriage shot is being set up 
  • I need to make a wig for Glenda, the woman sat next to Glenn on the train. 
  • I also need to put different arms on Manny because his current arms are starting to get a little tatty. 

Friday 
  • First day of the train carriage shot, starting with Glenn and Manny sat next to each other. I will need to place them in the carriage 
  • Puppeteering with Will and Hedley. 
  • Glenda's costume should arrive mid morning, I will need to put a rod in her and put the head on. She will be used in the shots after lunch.  
  • Be on standby for puppet repairs and maintenance 





Saturday, 4 October 2014

Week 29th Sept - 3rd Oct

On Monday we finished doing the close up shots for Glenn and Alpha. This is quite a funny part of the film as it will cut between Glenn sweating and breathing fast, about to throw up and the embryo in the man-womb. Each cut back to Glenn he will have more and more sweat on his face, until he eventually looks like he has just had a shower! I used glycerine for the sweat as it sits on the silicone better than water would and lasts longer. I'm not the biggest fan of using glycerine because it is so sticky and is a pain to clean off everything, and I have to be careful not to get it on the costumes. However, it is a very good effect and worth the effort. I was puppeteering Glenns arms, it was quite difficult because Will was controlling Glenn's head and body, and we both needed to stand in the exact same spot! Managed to solve this by repositioning how the rods sit in Glenns hands, so that I could puppeteer from the side. 


Painting on glycerine sweat


Tuesday we started on the shots from inside the cubicle. The back wall of the cubicle was removed so that the camera could look through. This quickly became a problem when we realised that you could see the reflection of the camera in the shiny red surface of the cubicle door! To fix this, Steve used a sheet of depron around the lens and then used a black sheet to cover himself while filming. This is a material that reflects light and is used quite a lot in cinematography for this purpose. It is also used architectural model making and various other crafts. 
This shows the depron around the camera



I took off Alpha's costume and detached the legs from the body. I then put rods in them from the top of the thigh, and put the trousers and shoes back on. I could now puppeteer these legs as if they were being dragged into the second cubicle to Glenns right. It worked really well and I think the shot will really look good! 



This scene is just after Glenn has thrown up Manny, and he bursts the door off the hinges and drags Alpha into the next cubicle to flush his head in the toilet. I applied glycerine to the cubicle door as Manny would have just come from the toilet and would be wet! 

Back view showing both cubicles, one with Glenn cowering in the corner and the other with Alpha's legs, ready for me to puppeteer! 
After we got this shot I quickly reattached Alpha's legs to his body. While I did this, the art director Katie put the back wall into the second cubicle and put the toilet in. With Katies help, we rigged Manny and Alpha into place in the cubicle. To make the puppets actually puppeteer-able we had to remove one of the floor panels, this also made room for the camera and tripod to fit in. Alpha's head was not visible so I didn't bother putting one on as it gave a bit of extra room in the cramped cubicle. I puppeteered Glenn with Katie, moving him from the corner of his own cubicle to then look into the next cubicle and glimpse Manny for the first time. 

We then did the shot where Manny runs out of the cubicle. On Wednesday we finished that shot and moved on to the shot where Manny opens the main door and beckons Glenn to follow him. This took a lot longer to set up than planned. The floor wasn't removable where Manny needed to be so I had to use a hole saw to cut a path for Manny's rod to fit through. 



Once this was done we were able to get the shot, although it took far too many takes to get it because of what an awkward position the rod needed to be in to get the beckoning looking right. For this shot, I started by just opening and closing the door from behind, but then ended up swapping with Will, who was having a hard time with the beckoning movement. We got it in the end! 

You can see me in the doorway peeking out, trying to see the monitor to look at the last take we did.
After this shot, we speedily moved on to getting Manny poking his hand up to open the toilet lid. I had already detached his arms and put a rod up one of them. I had to cut a bigger hold in the bottom of the toilet so that his arm would fit through properly, I did this with a stanley knife. Before each shot I had to recover the arm with glycerine to act as toilet water.
A polite greeting from Manny, shown on the monitor. 
Unfortunately because the setup took so long on Wednesday, we had to get the last shot on Thursday. This on required Simon and I though so it wasn't a problem luckily. The shot that we got on Thursday was an interesting one, it was of Glenn looking down into the toilet bowl and shutting the lid. But the camera was looking from Manny's point of view so we needed to shoot through water. To do this we used several magic arms to secure a pyrex dish in place, filled with a little water. Simon cut out the shape of a toilet seat and lid and attached to the rim of the dish. The camera was underneath the dish facing upwards. It only took about twenty minutes to get the shot, and it looks fantastic! I puppeteered Glenn and Simon did the lid closing and poured a small stream of water in the dish to disturb it a bit. 

For the rest of the day I worked on ticking off everything on the to do list! I removed Glenns coat and put his new shirt on, ready for the dancing on Friday. I put Manny's new arms on and reattached his legs so that they stopped moving out of position. I then cleaned off any glycerine on the puppets and tidied up the wigs. After lunch I got to work on making a new central neck mechanism. I had been discussing new ways to do this with Simon over lunch times and we came up with several ways that we could make it work using nylon rod rather than aluminium plates. 





This is the old mechanism. The main problem is the photo above, this happens with too much use or a really extreme movement of the neck. The central spring is actually curtain wire, with the case stripped off. It is a really good material and is used a lot in animatronics but once it has been bent too far, it wont go back to its original position and needs to be replaces. To repair it is an intensely fiddly job that I am not very good at doing. Emily, who made this mechanism could do it in about half an hour but it sometimes takes me longer, which is really bad for the schedule. This problem happens quite a lot, and the mechanisms lose tension really fast too. 


These are some sketches that Simon did while we were discussing possible ways to redesign the mechanism after Emily left. Thursday afternoon I took these images and was given free reign over what I did using the nylon rod and curtain wire... as long as it worked better! 



As I'm not allowed to use the band saw or any other machinery for insurance, one of the engineers kindly cut some 10mm thick disks and 30mm disks for me. I then found the centre of each and marked 4 spots on the 10mm and 30mm disks.


On the 10mm disk, I drilled holes about half way through on two opposite holes and then on the other two spots, I drilled all the way through. I also drilled a hole in the centre.  I did the same with the 30mm disk, but no central hole. I then used araldite to glue two lengths of curtain wire into the half way holes in the 30mm disk. 


 Once this was dry I glued the other ends into the 10mm disk half way holes. 



Once dry, I put the disk into a vice and drilled two small pilot holes for bolts into the top. These bolts were to wrap the wire around to keep the tension stronger. 



This is the finished rod, I hadn't tensioned it at this point but the central brass rod runs through the body of the puppet, with the lower clamp stopping it at a certain length. The wire threads through from the top of the disk, through both sides of the 10mm disk and into opposite sides of the brass rod, which then runs down to the lower section where it is tensioned onto the handle. I was so pleased that it worked! It's a much simpler mechanism and is much faster to repair if broken. I found that using two lengths of curtain wire stops the mechanism wanting to bend too far, making it unusable. 

I put this rod into Glenn ready for Fridays dance scene, and started making more for the other puppets, but concentrating on getting one for Manny first, as he needed a new one for Friday too. 

On Friday there was very little set up to be done regarding the set, but Steve had a big job on lighting because he needed to create the atmosphere of a night club. He used a black backdrop and haze, as well as a lot of lighting. We had all of the puppeteers in, some of whom had to move lights around rather than control puppets. We spent the day trying out a lot of different dance moves, and swapping who was controlling which puppet or light to get some variations in shots. Simon was keen to get as much footage as possible so there was a lot to choose from in the edit. 

I found a new confidence in my abilities to fix things this week, and I'm really pleased that there is a new mechanism for the puppets, things should start to run a lot smoother now. Next week we will continue the montage scene, starting on Tuesday with the shot outside of the night club. 